Strategic monitoring policy

P6.3 treats monitoring as a decision. It selects a frequency, route, sensor, sampling intensity, and event years from explicit options, ranked by an approximate value of information.

Inputs

MonitoringSpan records the span, its segments, baseline uncertainty, service risk, and route length. MonitoringOption records a span, sensor, route, interval, sampling intensity, cost per event, uncertainty reduction, and risk reduction.

MonitoringConfig sets the horizon, start year, total budget, value per unit, cost penalty, and minimum net value. An option is eligible only when its net value is positive.

Value of information

The declared proxy is:

gross = value_per_unit * (
    baseline_uncertainty * uncertainty_reduction
    + service_risk * risk_reduction
)
total_cost = cost_per_event * number_of_events
net = gross - cost_weight * total_cost

Events are scheduled at start_year, then every interval_years through the horizon. The policy selects at most one option per span, in descending net value, while the total cost fits the budget. It is not a fixed calendar because the interval and option are chosen by the value proxy.

from brushline.strategic.monitoring import build_monitoring_policy

policy = build_monitoring_policy(
    policy_id="strategy-v1",
    instance_id="corridor-1",
    spans=spans,
    options=options,
)
assert policy.decisions

Reports

MonitoringDecision records the span, option, sensor, route, interval, sampling intensity, start and end years, event years, total cost, gross value, net value, and expected uncertainty/risk reductions. MonitoringPolicy aggregates total cost, budget, reductions, net value, feasibility, violations, and caveats.

Caveats

The value-of-information proxy is an assumption. It is not a structural sensor simulation, a mission routing engine, or a field-calibrated information value. Event dates remain subject to route, weather, and operational feasibility. A missing budget or unavailable route is explicit.

Limits

  • Only one option per span is selected.

  • The proxy ignores information’s effect on later decisions beyond the declared reductions.

  • The total budget is a planning cap, not a per-year cash constraint.

  • No live sensor, flight, or field campaign is executed.