Uncertainty and sensitivity

The uncertainty layer samples execution assumptions around a fixed tactical plan:

  • cost multiplier;

  • productive-hours multiplier (lower productivity increases hours);

  • contractor-capacity multiplier.

It reports P10/P50/P90 for cost, hours, budget overrun, crew-hour shortfall, and contractor shortfall, plus deterministic one-at-a-time cases for cost +20%, productivity -20%, capacity -20%, and combined stress.

This is execution uncertainty, not a stochastic re-optimization. The plan is held fixed; the sampler asks what happens if its cost, productivity, and capacity assumptions move. A later layer could re-plan inside each sample.

The sampler is seeded and records every sampled outcome. It does not replace the MILP frontier or the Fresh Solutions heuristic; it adds uncertainty around a selected plan.