Fall-window capacity remedy
Observed-calendar awareness defers whole actions when the 75-day fall calendar cannot fit them. This remedy extends the work window to 90 and 105 days while holding the crew and machine mix fixed. It is an operational what-if, not a field schedule or a costed seasonal plan.
Results
20 episodes, seed 7.
Window days |
Completed scope P50 |
Retained scope P50 |
Mean risk |
Cost P50 |
Unscheduled h |
Calendar deferrals |
|---|---|---|---|---|---|---|
75 |
87.6% |
87.6% |
0.0502 |
264,047 |
0.0 |
39.9 |
90 |
95.9% |
95.9% |
0.0365 |
285,490 |
0.0 |
15.0 |
105 |
98.1% |
98.1% |
0.0333 |
294,012 |
0.0 |
4.6 |
The longer window recovers scope and lowers mean risk. Action cost rises because more work is retained; added seasonal overhead, supervision, and weather exposure are not modelled.
590-segment scale test
A replicated 590-segment instance scales the workforce to 30 crews and 30 machines. The fixed plan is exact; annual re-solves use Fresh Solutions.
Window days |
Completed scope P50 |
Retained scope P50 |
Mean risk |
Cost P50 |
Calendar deferrals |
|---|---|---|---|---|---|
75 |
84.5% |
84.5% |
0.0667 |
2,536,614 |
484.3 |
90 |
95.9% |
95.9% |
0.0368 |
2,844,469 |
182.0 |
105 |
98.1% |
98.1% |
0.0328 |
2,931,649 |
58.8 |
Runtime: fixed exact 47.4 s; window sweep 244.9 s for 20 episodes. The remedy recovers almost all calendar-aware scope at scale. Action cost rises because more work is retained; added seasonal overhead, supervision, and weather exposure are not modelled.
Limits
Window extension is not a field calendar.
Crew and machine mix is held fixed.
No added seasonal overhead or supervision cost.
Whole-action deferral; no partial treatment credit.
No safety, access, asset-owner priority, or field-calibration claim.